Boreholes requiring authorisation under water law

Drilling through groundwater-protecting layers, several groundwater levels or into pressurised water requires a permit under water law.

Course description

The water law permit for drilling work requiring authorisation must be applied for in good time before the planned start of work. This work includes, for example, groundwater measuring points, exploratory drillings and ground soundings.

For the compilation of complete and verifiable application documents, please refer to the leaflet "Application documents for boreholes requiring authorisation" from the Munich Water Management Office (available under "Documents and links").

If boreholes are developed into groundwater measuring points, the specifications of the leaflet "Minimum criteria for the construction of groundwater measuring points" of the Munich Water Management Office, which can be found under "Documents and links", must be observed.

Boreholes that only tap the first or quaternary groundwater storey are only subject to notification. (see link to the drilling notification "Drilling and work in groundwater" under "Documents and links")

The extraction of groundwater for pumping tests is not subject to authorisation up to a duration of 144 hours. Longer periods or tests on several wells at the same time lasting longer than 72 hours are subject to authorisation.

As a rule, a separate water law procedure must be carried out for subsequent utilisation of the groundwater tapped by the well.

Required documents

See information sheet "Application documents for boreholes requiring authorisation" from the Munich Water Management Office (can be found under "Documents and links").

The documents are required in digital form and also in paper form in triplicate.

Duration and costs

Processing time

The duration of the procedure is several months and depends on the individual case, the fulfilment of all requirements for approval and the additional processing time for other specialist departments involved in the procedure.

Fees and charges

at least 100 euros up to a maximum of 15,000 euros

Legal basis

§ Article 9 of the Federal Water Act (WHG)

Article 15 of the Bavarian Water Act (BayWG)

Contact Us

Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht
Landeshauptstadt München

Internet address

Postal address

Landeshauptstadt München
Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht

Bayerstraße 28a
80335 München

Address

Bayerstraße 28a
80335 München

Related services

Water law permit - building in flood areas

A water law permit is required for the construction or extension of buildings in flood areas.

Display for a garden fountain

If you wish to install a well to irrigate your private garden with groundwater, you must give at least one month's notice.

Drilling indicator well - heat pump/ cooling system from 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Water law authorisation - service water wells

If you want to use groundwater for industrial water purposes, you need a permit under water law.

Water licence - heat pump/ cooling system up to 50kW

If you operate a heat pump or cooling system and extract or infiltrate groundwater via wells, you will need a permit under water law.

Water law permit - rainwater infiltration in water protection areas

A permit under water law is required for the infiltration of rainwater into the ground in a water protection area.

Drilling indicator well - heat pump/ cooling system up to 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Completion of the replacement planting

If you have felled a tree, a replacement planting may be required as compensation. The completion of this replanting must be reported.

Report tree damage (during construction work)

If trees are damaged without authorisation, owners or polluters can be obliged to restore or plant replacement trees.