Completion of the replacement planting

If you have felled a tree, a replacement planting may be required as compensation. The completion of this replanting must be reported.

Course description

After tree felling or other changes to the woodland in landscape conservation areas and protected landscape features, replacement planting may be required as compensation. If you wish to finalise this, you must notify the Lower Nature Conservation Authority. Please complete the form below and send it to the Lower Nature Conservation Authority in the Department for Climate and Environmental Protection by e-mail or post.

Landeshauptstadt München

Referat für Klima- und Umweltschutz
Sachgebiet Untere Naturschutzbehörde, Fachgutachten

Internet address

Postal address

Landeshauptstadt München
Referat für Klima- und Umweltschutz
Sachgebiet Untere Naturschutzbehörde, Fachgutachten

Bayerstraße 28a
80335 München

Address

Blumenstraße 28b
80331 München

Related services

Water law permit - construction projects in groundwater

Construction projects may result in interference with the groundwater. A permit under water law is required for this.

Advice on the ecological criteria catalogue

If you want to build on a municipal property, you must comply with the ecological criteria catalogue of the City of Munich. We can advise you on this.

Report tree damage (during construction work)

If trees are damaged without authorisation, owners or polluters can be obliged to restore or plant replacement trees.

Tree felling - Protected tree species

In Munich, certain trees are specially protected by the Tree Protection Ordinance. These trees may only be cut down or pruned with authorisation.

Display for a garden fountain

If you want to construct a well to water your private garden with the groundwater, you must notify us at least one month in advance.

Water licence - heat pump/ cooling system up to 50kW

Anyone who pumps or infiltrates groundwater via a well and uses it to operate a groundwater heat pump or cooling system requires a permit under water law.

Water permit - heat pump/ cooling system from 50kW

Anyone who extracts or infiltrates groundwater via a well and uses it to operate a groundwater heat pump or cooling system requires a water licence.

Water law permit - building in flood areas

A water law permit is required for the erection or extension of structures in an identified and mapped floodplain.

Drilling and working in groundwater

Work that penetrates so deeply into the ground that groundwater could be encountered must be reported at least one month before the planned start of work.

Water law permit - geothermal probe/ geothermal collector

A permit under water law is required for the construction of a geothermal system (probe, collector, baskets or similar) with groundwater contact.