Acceptance of temporary structures

Temporary structures must obtain a construction licence before being erected for the first time. As a rule, the installation must be notified at least one week in advance.

Description

The authority decides whether to carry out an acceptance test. The inspections by experts stipulated in the construction licence are a prerequisite for the acceptance test. A date for the acceptance test must be agreed with the competent authority in good time. The installation must be completed by then.

Required documents

  • Display form
  • Site plan on a scale of 1:1000
  • Seating plan (from 400 guest places)
  • Original inspection logbook upon request, but no later than the acceptance date
  • Further documents in individual cases after consultation

Duration & Costs

Fees

Acceptance for use is subject to a fee. The fees are calculated on a case-by-case basis according to the expense and importance of the matter.

Payment methods available

Legal basis

Bavarian building regulations

Landeshauptstadt München

Referat für Stadtplanung und Bauordnung
Team 12 Statik u. bautechnische Sonderverfahren

Internet

Postal address

Landeshauptstadt München
Referat für Stadtplanung und Bauordnung
Team 12 Statik u. bautechnische Sonderverfahren

Blumenstraße 28b
80331 München

Address

Blumenstraße 28b
80331 München

We are closed to the public, the service telephones are manned.

Personal consultation:
Monday to Friday (except Wednesday)
9.00 to 12.00 noon
Tuesday and Thursday
13.30 to 16.00

Telephone counselling
Monday to Thursday
9.00 to 16.00
Friday 9.00 to 12.00

Related services

Preservation statutes - authorisation of construction measures

You need a permit for structural alterations, changes of use or the demolition of living space in a conservation area.

Construction measures in public transport areas

Anyone who digs up the ground on public paths, roads or squares, stores or sets up anything, blocks off areas or lays pipes requires a permit.

Building permit

As a rule, you need a building permit from the lower building supervisory authority for construction measures such as new builds, extensions or conversions as well as for changes of use.

Advice on building law

If you are planning a new build, conversion or change of use of a building, the LBK advice centre will answer your questions before you submit your application.

Access to building files (central registry)

If you own a property in the Munich city area, you can view the approved building plans for your house and copy them at coin-operated photocopiers on site.

Special use of urban public green spaces

Anyone wishing to set up a construction site in a public green space or drive on the green space requires a special permit.

Apply for house number allocation

In the event of structural changes, house numbers are assigned ex officio. Additional house numbers can be issued or existing properties renumbered on request.

Neighbour signatures for building application

Approval of construction projects where the city is a neighbouring property owner.

Advice on neighbour's signature for building application

Owners of neighbouring properties must be involved in the approval process.