Notification of handling and storage of substances hazardous to water

You must give at least 6 weeks' notice before commissioning or significantly modifying systems that use or store substances hazardous to water.

Description

Substances hazardous to water are, for example, heating oil, diesel, petrol or waste oil.

Prerequisites

Above-ground installations for liquid substances hazardous to water must be notified if the volume is

  • greater than 100,000 litres (=100 m³) for substances of WGK 1,
  • greater than 1,000 litres (=1 m³) for substances of WGK 2 and
  • greater than 220 litres (=0.22 m³) for substances of WGK 3.

Required documents

  • Completed notification form with attachments
  • Site plan

Duration & Costs

Processing time

up to 6 weeks

Landeshauptstadt München

Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht

Bei Fragen zu privaten Anlagen schreiben Sie uns bitte eine E-Mail!

Internet

Phone

Postal address

Landeshauptstadt München
Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht

Bayerstraße 28a
80335 München

Address

Bayerstraße 28a
80335 München

Monday, Tuesday, Wednesday, Thursday
9 am - 3 pm

Related services

Authorisation under immission control law - amendment

Changes to the location, nature or mode of operation of an installation requiring authorisation under the Federal Immission Control Act must be reported in good time.

Immission control licence - application

Industrial plants that cause heavy air and noise pollution or use hazardous substances require a licence.