Display for a garden fountain

If you wish to install a well to irrigate your private garden with groundwater, you must give at least one month's notice.

Course description

If the work is not prohibited within one month of receipt of the notification with the complete documentation, the project may commence in accordance with the submitted planning.

No further authorisation is required for the use of groundwater via the constructed garden well.

Required documents

The documents should preferably be submitted digitally.

  • Completed and signed notification form (see "Links and documents")
  • Site plan with entry of the well location (e.g. from BayernAtlas)

Duration and costs

Processing time

Maximum one month.

Legal basis

Section 49 of the Federal Water Act (WHG)Article 30 of the Bavarian Water Act (BayWG)

Contact Us

Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht
Landeshauptstadt München

Internet address

Postal address

Landeshauptstadt München
Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht

Bayerstraße 28a
80335 München

Contact address

Bayerstraße 28a
80335 München

Availability

  • Available:Barrier-free access
  • Not available:Parking for disabled people

Related services

Drilling and working in groundwater

Drilling operations that reach so deep into the ground that they could come into contact with groundwater must be reported and, in some cases, require a permit

Water law authorisation - service water wells

If you want to use groundwater for industrial water purposes, you need a permit under water law.

Water law permit - rainwater infiltration in water protection areas

A permit under water law is required for the infiltration of rainwater into the ground in a water protection area.

Water licence - heat pump/ cooling system up to 50kW

If you operate a heat pump or cooling system and extract or infiltrate groundwater via wells, you will need a permit under water law.

Completion of the replacement planting

If you have felled a tree, a replacement planting may be required as compensation. The completion of this replanting must be reported.

Advice on the ecological criteria catalogue

If you want to build on a municipal property, you must comply with the ecological criteria catalogue of the City of Munich. We can advise you on this.

Water law permit - construction projects in groundwater

If you intervene in the groundwater during a construction project, a permit under water law is required.

Water law permit - geothermal probe/ geothermal collector

A permit under water law is required for the construction of a geothermal system (probe, collector, baskets or similar) with groundwater contact.