Height fixed points and height index

If you need individual height reference points or the entire height index for planning a building, you can order them here.

Description

Height control points are used as a basis for planning and for checking structures under construction. The urban area comprises around 10,000 height control points (HFP). The register of fixed elevation points provides evidence of the fixed elevation points.

Prerequisites

A levelling device is required to use the data.

Duration & Costs

Processing time

One to two working days

Fees

  • per point: 20 Euro
  • each additional point:10 Euro
  • complete height index (PDF): 2.000 Euro

Payment methods available

Landeshauptstadt München

Kommunalreferat
GeodatenService
SG Servicezentrum

Internet

Postal address

Landeshauptstadt München
Kommunalreferat
GeodatenService
SG Servicezentrum

Denisstraße 2
80335 München

Address

Denisstraße 2
80335 München

Related services

Information from the land use plan

If you would like to obtain information about properties in the City of Munich's land utilisation plan or purchase the plan, please contact us.

Ordering geodata

You can order geodata from the City of Munich - data that relates to location or altitude, such as address data with georeferencing.

Extract from the city map

You can order map sections with boundaries, buildings, parcel numbers, house numbers, street names, ridge line, number of storeys, topography and building line structure.

Information on the maximum groundwater level

The GeodataService Munich determines the probable maximum groundwater level (HW 1940) for the planning and assessment of future building and civil engineering measures.

Groundwater information

Here you will find the right contacts if you need official information on groundwater, geological and hydrogeological data.

Order DXF file

You can obtain a digital section of the city base map in vector format for processing in CAD programmes in DXF or DWG format

Official site plan

An official site plan is required as an enclosure to the building application. The local building commission decides which design is required.