Display for a garden fountain

If you want to construct a well to water your private garden with the groundwater, you must notify us at least one month in advance.

Description

If the work is not prohibited within one month of receipt of the notification with complete documentation, the project may commence in accordance with the planning submitted.

The use of groundwater via the constructed garden well is not subject to authorisation.

Required documents

All documents are required in 1 copy by e-mail.

  • Completed and signed notification form
  • Site plan with entry of the well location (e.g. from BayernAtlas)

Duration & Costs

Processing time

Maximum four weeks

Legal basis

§ Section 49 of the Water Resources Act (WHG)
Art. 30 Bavarian Water Act (BayWG)

Landeshauptstadt München

Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht

Internet

Postal address

Landeshauptstadt München
Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht

Bayerstraße 28a
80335 München

Address

Bayerstraße 28a
80335 München

Related services

Tree felling - Protected tree species

In Munich, certain trees are specially protected by the Tree Protection Ordinance. These trees may only be cut down or pruned with authorisation.

Water licence - heat pump/ cooling system up to 50kW

Anyone who pumps or infiltrates groundwater via a well and uses it to operate a groundwater heat pump or cooling system requires a permit under water law.

Water permit - heat pump/ cooling system from 50kW

Anyone who extracts or infiltrates groundwater via a well and uses it to operate a groundwater heat pump or cooling system requires a water licence.

Drilling indicator well - heat pump/ cooling system from 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Water law permit - construction projects in groundwater

In the course of a construction project, there may be interventions in the groundwater for which a permit under water law is required.

Drilling indicator well - heat pump/ cooling system up to 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Drilling and working in groundwater

Work that penetrates so deeply into the ground that groundwater could be encountered must be reported at least one month before the planned start of work.

Tree felling - protected landscape areas

If you want to cut down a tree or make other changes to a tree in a landscape conservation area, you must submit an application.

Water law permit - rainwater infiltration in water protection areas

A permit under water law is required for the extensive infiltration of rainwater into the subsoil in a water protection area.

Report tree damage (during construction work)

If trees are damaged without authorisation, owners or polluters can be obliged to restore or plant replacement trees.