Authorisation for waste disposal facilities

Anyone wishing to construct or operate a facility for the treatment, handling or storage of waste requires a permit under immission control law.

Description

This authorisation is a comprehensive real concession which, with a few exceptions, replaces all other permits under public law for the specific project (= concentration effect).

Important steps in the complex procedure are

  • Advising the applicant on the procedure and documents
  • Checking the completeness of the documents
  • Submission to the public interest organisations
  • public display and discussion of objections (in part)
  • Comparison of the comments received
  • Preparation of decision

We have compiled four golden rules to speed up immission control application and authorisation procedures.

Before preparing the application documents, we strongly recommend that you obtain comprehensive advice from the processing office.

Duration & Costs

Processing time

Between 3 and 7 months from the time the documents are complete, depending on the type of procedure to be carried out.

Fees

Staggered percentages, depending on the investment volume

Payment methods available

Legal basis

§§ Sections 4 et seq. of the Federal Immission Control Act in conjunction with the 9th Ordinance on the Implementation of the Federal Immission Control Act (Ordinance on the Authorisation Procedure).

Landeshauptstadt München

Referat für Klima- und Umweltschutz
Sachgebiet Abfallrecht

Internet

Postal address

Landeshauptstadt München
Referat für Klima- und Umweltschutz
Sachgebiet Abfallrecht

Bayerstraße 28a
80335 München

Fax: +49 89 233-47690

Address

Bayerstraße 28a
80335 München

By telephone agreement

Related services

Commercial waste collection and transport

Anyone wishing to collect or transport hazardous waste on a commercial basis generally requires a waste transport licence.

Utilisation of animal by-products

If you require animal by-products for training or research purposes, you must register your requirements.

Waste producer number

If waste producers who are required to provide evidence generate at least two tonnes of hazardous waste per year, they require a waste producer number.

Trading and brokering with waste

Anyone wishing to trade or broker hazardous waste on a commercial basis or as part of a commercial enterprise requires a waste licence.