Water law permit - authorisation of installations on bodies of water

If a facility is built, modified or decommissioned up to 60 metres on, in, over or under a body of water, a water law permit is required.

Course description

you need a permit if you want to erect, extend, significantly alter or decommission a structure on, in, over or under a body of water. This applies within an area of 60 metres around the body of water.

In the city of Munich, this applies to the following bodies of water:

  • Isar,
  • Würm,
  • Würmkanal,
  • Hachinger Bach,
  • Nymphenburg-Biedersteiner Canal,
  • Auer Mühlbach,
  • Schleißheim Canal,
  • Eisbach,
  • Fabrikbach,
  • Stadtmühlbach,
  • Stadtsägmühlbach,
  • Oberstjägermeisterbach including the side arms to Schwabinger Bach,
  • Schwabinger Bach and
  • Garchinger Mühlbach.

The term "structure" includes, for example

  • Jetties
  • Sheds
  • Composting facilities
  • Fences
  • Paving stones
  • small garden sheds that do not require planning permission
Please note

Please note

Further information on the application process and the required documents can be found in the application form (available under "Documents and links").

Required documents

Application form with the documents listed on the form

Duration and costs

Fees and charges

0.5 per cent of the construction sum

Legal basis

§ Section 36 (1) of the Federal Water Act (WHG)

Article 20 of the Bavarian Water Act (BayWG)

Contact Us

Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht
Landeshauptstadt München

Internet address

Postal address

Landeshauptstadt München
Referat für Klima- und Umweltschutz
Sachgebiet Wasserrecht

Bayerstraße 28a
80335 München

Address

Bayerstraße 28a
80335 München

Related services

Water licence - heat pump/ cooling system up to 50kW

If you operate a heat pump or cooling system and extract or infiltrate groundwater via wells, you will need a permit under water law.

Tree felling - Protected tree species

In Munich, certain trees are specially protected by the Tree Protection Ordinance. These trees may only be cut down or pruned with authorisation.

Drilling indicator well - heat pump/ cooling system up to 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Display for a garden fountain

If you wish to install a well to irrigate your private garden with groundwater, you must give at least one month's notice.

Water law permit - rainwater infiltration in water protection areas

A permit under water law is required for the infiltration of rainwater into the ground in a water protection area.

Water law permit - construction projects in groundwater

If you intervene in the groundwater during a construction project, a permit under water law is required.

Water permit - heat pump/ cooling system from 50kW

Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.

Water law permit - building in flood areas

A water law permit is required for the construction or extension of buildings in flood areas.

Report tree damage (during construction work)

If trees are damaged without authorisation, owners or polluters can be obliged to restore or plant replacement trees.

Drilling and working in groundwater

Work that penetrates so deeply into the ground that groundwater could be encountered must be reported at least one month before the planned start of work.