Citizen Services Search
30 Results found for "watering"
Exemption from the licence fee
Exemption from the licence fee is possible for those entitled to benefits, trainees and holders of a severely disabled pass with the RF mark.
Closure of duct connections
On request, sewer connections can be closed permanently or temporarily to secure the sewer and excavation pit during construction work.
Water law authorisation - service water wells
If you want to use groundwater for industrial water purposes, you need a permit under water law.
Water law permit - rainwater infiltration in water protection areas
A permit under water law is required for the infiltration of rainwater into the ground in a water protection area.
Water outlet for garden irrigation
If you do not discharge large quantities of irrigation water for your garden into the municipal sewage system, you can apply for a reduction in the drainage fee.
Notification of start of work on site drainage
If you wish to carry out work on property drainage systems, the company carrying out the work must notify the municipal drainage department before starting construction.
Temporary sewer connections
If you are planning construction site facilities or events (street parties, etc.), you can request temporary sewer connections for sanitary containers.
Water law permit - building in flood areas
A water law permit is required for the construction or extension of buildings in flood areas.
Water law permit - construction projects in groundwater
If you intervene in the groundwater during a construction project, a permit under water law is required.
Water permit - heat pump/ cooling system from 50kW
Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.
Water licence - heat pump/ cooling system up to 50kW
If you operate a heat pump or cooling system and extract or infiltrate groundwater via wells, you will need a permit under water law.
Electricity, gas and water from the municipal utilities
If you have recently moved to Munich, you can register online with Stadtwerke München for M-Strom and M-Erdgas.
Authorisation for waste water from façade cleaning
A discharge permit is required for the discharge of wastewater from surface cleaning (such as building façades and underground car parks) into the municipal sewerage system.
House connection - electricity, natural gas, district heating and water
Professional supply of electricity, natural gas, district heating and water: The grid operator establishes or modifies the grid connection.
Water law permit - geothermal probe/ geothermal collector
A permit under water law is required for the construction of a geothermal system (probe, collector, baskets or similar) with groundwater contact.
Display for a garden fountain
If you wish to install a well to irrigate your private garden with groundwater, you must give at least one month's notice.
Notification of handling and storage of substances hazardous to water
The commissioning or modification of installations that use or store substances hazardous to water must be notified at least six weeks in advance.
Sale of firewood
You can saw firewood in the municipal forests and cut it yourself. We do not offer firewood ready for the stove, you must collect and cut it yourself.
Permit for rainwater infiltration
If you wish to infiltrate rainwater in a targeted manner, you must obtain a water law permit under certain conditions.
Drilling indicator well - heat pump/ cooling system from 50kW
Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.
Change of operator for installations handling substances hazardous to water
If the operator of a system subject to inspection in accordance with Section 46 AwSV changes, this must be reported.
Drilling indicator well - heat pump/ cooling system up to 50kW
Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.
Amalgam separator authorisation
If you operate a dental practice, no liquids or substances classified as hazardous may be discharged into the municipal drainage system.
Advice on the ecological criteria catalogue
If you want to build on a municipal property, you must comply with the ecological criteria catalogue of the City of Munich. We can advise you on this.
Authorisation for site drainage
If you wish to construct or modify a property drainage system, drainage plans must be submitted in advance for approval.