Service finder

13 results found for "pump"

Drilling indicator well - heat pump/ cooling system from 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Drilling indicator well - heat pump/ cooling system up to 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Water permit - heat pump/ cooling system from 50kW

Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.

Water licence - heat pump/ cooling system up to 50kW

If you operate a heat pump or cooling system and extract or infiltrate groundwater via wells, you will need a permit under water law.

Groundwater information

Here you will find the people to contact if you need official information about Munich's groundwater and geological and hydrogeological data.

Promotion of heating replacement (BEG-coupled) (FKG)

If you are planning to replace the heating in an existing residential building, you can apply for a subsidy.

Water law permit - construction projects in groundwater

If you intervene in the groundwater during a construction project, a permit under water law is required.

Drilling and working in groundwater

Work that penetrates so deeply into the ground that groundwater could be encountered must be reported at least one month before the planned start of work.

Refurbishment with life cycle greenhouse gas balance (LCA)

If you are planning to renovate an existing residential building, you can apply for a subsidy.

Promotion of refurbishment standard (BEG-linked) (FKG)

If you are planning to renovate an existing residential building, you can apply for a subsidy.