Service finder
30 results found for "ground"
Filming authorisation - school building and school grounds
You require a permit to make film, television, photo and sound recordings on municipal school premises and in municipal school buildings.
Ground markings in front of driveways
The permissibility of applying road markings in front of driveways to private properties requires examination and approval by the Mobility Department.
Hire of school sports facilities
Clubs, social organisations, private groups and commercial providers can rent sports halls, swimming pools and outdoor sports facilities for sporting purposes.
Groundwater information
Here you will find the people to contact if you need official information about Munich's groundwater and geological and hydrogeological data.
Drilling and working in groundwater
Work that penetrates so deeply into the ground that groundwater could be encountered must be reported at least one month before the planned start of work.
Water law permit - construction projects in groundwater
If you intervene in the groundwater during a construction project, a permit under water law is required.
Information on the maximum groundwater level
The GeodataService Munich determines the probable maximum groundwater level (HW 1940) for the planning and assessment of future building and civil engineering measures.
Wildlife and hunting in the city
Numerous wild animal species live in the city. As humans and wild animals have to share the same habitat, problems can arise.
Construction measures in public transport areas
Anyone who digs up the ground on public paths, roads or squares, stores or sets up anything, blocks off areas or lays pipes requires a permit.
Water permit - heat pump/ cooling system from 50kW
Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.
Water licence - heat pump/ cooling system up to 50kW
If you operate a heat pump or cooling system and extract or infiltrate groundwater via wells, you will need a permit under water law.
Drilling indicator well - heat pump/ cooling system from 50kW
Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.
Drilling indicator well - heat pump/ cooling system up to 50kW
Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.
Water law permit - geothermal probe/ geothermal collector
A permit under water law is required for the construction of a geothermal system (probe, collector, baskets or similar) with groundwater contact.
Defective play equipment or soiling on public playgrounds
If you notice any defective playground equipment or soiling in public playgrounds, please report it to us.
Playground equipment hire
Private individuals, schools, kindergartens, clubs, non-profit organisations and companies can borrow play equipment and toys from the Department of Education and Sport.
Green space supervision
The green space supervisors from the building department monitor compliance with the city's regulations in the public green spaces.
Acceptance of temporary structures
Temporary structures must obtain a construction licence before being erected for the first time. As a rule, the installation must be notified at least one week in advance.
Apply for a travelling trade licence
If you would like to exercise a travelling trade, submit your application here.
Selling grave decorations on All Saints' Day
Would you like to sell flowers or other grave decorations near cemeteries on All Saints' Day? Then you must submit an application.
Notification of start of work on site drainage
If you wish to carry out work on property drainage systems, the company carrying out the work must notify the municipal drainage department before starting construction.
Hand in lost property
If you have found something that is worth more than ten euros, you must hand it in at a lost property office.
Mobile bike stand in front of a shop
If you want to set up a mobile bicycle stand in front of your shop, you generally do not need a special use permit under certain conditions.
Access control voucher - Oktoberfest and Oide Wiesn
If you require an access permit for the Oktoberfest grounds and the Oide Wiesn, you can apply for an entry authorisation.
Authorisation for waste water from façade cleaning
A discharge permit is required for the discharge of wastewater from surface cleaning (e.g. facades, underground car parks) into the municipal sewage system.
Monument protection
Anyone wishing to remove, alter or relocate monuments or parts thereof requires a permit in accordance with the Bavarian Monument Protection Act.
Water law permit - rainwater infiltration in water protection areas
A permit under water law is required for the infiltration of rainwater into the ground in a water protection area.
Burial in the hedge gardens
The "Heckengärten" at the Perlacher Forst cemetery is the first maintenance-free communal burial ground where coffins and urns can be buried together.
Access permit for the Oktoberfest ring road
If you live, work or are a hotel guest within the restricted area, you will need an access permit for your vehicle for the duration of the Oktoberfest.
Display for a garden fountain
If you wish to install a well to irrigate your private garden with groundwater, you must give at least one month's notice.