Water outlet for garden irrigation

If you do not discharge large quantities of irrigation water for your garden into the municipal sewage system, you can apply for a reduction in the drainage fee.

Description

If you do not discharge large quantities of fresh water into the municipal sewerage system due to extensive garden irrigation, you can claim a reduction for these water quantities by installing a calibrated intermediate meter. The costs for the installation of the intermediate meter must be borne by you.

Please note:
You are responsible for maintaining the water meter and replacing it with a new water meter at the end of the 6-year calibration period.

Required documents

  • Fully completed application form (download)
  • Proof of professional installation of the water meter by a specialised company

Duration & Costs

Processing time

approx. 14 days

Legal basis

§ Section 7 (4) of the Drainage Charge Statutes

Landeshauptstadt München

Münchner Stadtentwässerung (MSE)
Zentrale Aufgaben
Gebührenbüro

Internet

Postal address

Landeshauptstadt München
Münchner Stadtentwässerung (MSE)
Zentrale Aufgaben
Gebührenbüro

Friedenstraße 40
81671 München

Fax: +49 89 233-98962700

Address

Friedenstraße 40
81671 München

Monday to Friday 8.30 a.m. - 12.00 p.m
Monday, Tuesday, Thursday 13.00 - 16.00 hrs

Related services

Information on sewer connection options

If you require information on connection options for property drainage systems to the municipal sewer, you can request it here.

Closure of duct connections

On request, sewer connections can be closed permanently or temporarily to secure the sewer and excavation pit during construction work.

Authorisation for waste water from façade cleaning

If you use chemical cleaning agents to clean your outdoor areas (facades, underground car parks), you will need a wastewater disposal permit.

Temporary sewer connections

If you are planning construction site facilities or events (street parties, etc.), you can request temporary sewer connections for sanitary containers.

Notification of start of work on site drainage

If you wish to carry out work on property drainage systems, the company carrying out the work must notify the municipal drainage department before starting construction.

Site drainage digital plan copy

If you require a copy of the drainage plan for your property drainage system, you can submit an application here.

Permit for rainwater infiltration

If you wish to infiltrate rainwater in a targeted manner, you must obtain a water law permit under certain conditions.

Amalgam separator authorisation

If you run a dental practice, you must not discharge any liquids or substances that are classified as hazardous into the municipal drainage system.

Authorisation for site drainage

If you wish to construct or modify a property drainage system, drainage plans must be submitted in advance for approval.

Inspection of site drainage plans

If you want to make a change to your property drainage system, you can request a plan inspection.