Service finder
13 results found for "groundwater"
Groundwater information
Here you will find the people to contact if you need official information about Munich's groundwater and geological and hydrogeological data.
Drilling and working in groundwater
Work that penetrates so deeply into the ground that groundwater could be encountered must be reported at least one month before the planned start of work.
Information on the maximum groundwater level
The GeodataService Munich determines the probable maximum groundwater level (HW 1940) for the planning and assessment of future building and civil engineering measures.
Water law permit - construction projects in groundwater
Construction projects may result in interference with the groundwater. A permit under water law is required for this.
Water permit - heat pump/ cooling system from 50kW
Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.
Water licence - heat pump/ cooling system up to 50kW
Anyone operating a groundwater heat pump or cooling system and thus pumping or infiltrating groundwater via a well requires a permit under water law.
Drilling indicator well - heat pump/ cooling system from 50kW
Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.
Drilling indicator well - heat pump/ cooling system up to 50kW
Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.
Water law permit - geothermal probe/ geothermal collector
A permit under water law is required for the construction of a geothermal system (probe, collector, baskets or similar) with groundwater contact.
Water law permit - rainwater infiltration in water protection areas
A permit under water law is required for the infiltration of rainwater into the ground in a water protection area.
Display for a garden fountain
If you wish to install a well to irrigate your private garden with groundwater, you must give at least one month's notice.
Notification of handling and storage of substances hazardous to water
The commissioning or significant modification of installations that use or store substances hazardous to water must be notified at least six weeks in advance.
Permit for rainwater infiltration
If you wish to infiltrate rainwater in a targeted manner, you must obtain a water law permit under certain conditions.