Tree felling - Protected tree species

In Munich, certain trees are specially protected by the Tree Protection Ordinance. These trees may only be cut down or pruned with authorisation.

Description

The Munich Tree Protection Ordinance protects the following trees:

  • all deciduous and coniferous trees with a trunk circumference of 80 cm or more, measured at a height of 1 m above the ground, as well as multi-stemmed trees if one trunk has a circumference of at least 40 cm and the sum of all trunks is at least 80 cm.
  • Fruit trees are exempt from the Tree Protection Ordinance (this does not apply to pear, elder, crab apple, bird cherry, hazel and walnut).
  • Replacement trees (also with a smaller trunk circumference) that have been designated and planted.

Required documents

  • Individual felling application
  • Tree inventory declaration and tree inventory plan as part of a building permit procedure

Duration & Costs

Fees

25 to 3,500 euros

Legal basis

Bavarian Building Code, Tree Protection Ordinance, Nature Conservation Act

Landeshauptstadt München

Referat für Stadtplanung und Bauordnung
Abt. 5 Baumschutz und Freiflächengestaltung

Internet

Phone

Consultation hours

  • Mon 09:00 - 12:00
  • Tue 09:00 - 12:00
  • Wed 09:00 - 12:00
  • Thu 09:00 - 12:00
  • Fri 09:00 - 12:00
  • Sat Closed
  • Sun Closed

Postal address

Landeshauptstadt München
Referat für Stadtplanung und Bauordnung
Abt. 5 Baumschutz und Freiflächengestaltung

Blumenstraße 28b
80331 München

Fax: +49 89 233-25869

Address

Blumenstraße 28b
80331 München

General enquiries can be directed to the advice centre by telephone or e-mail. Personal appointments must be arranged in advance.

Telephone counselling:

Monday to Friday 10 am to 12 noon

Tuesday and Thursday 2 to 4 pm

Related services

Tree felling - protected landscape areas

If you want to cut down a tree or make other changes to a tree in a landscape conservation area, you must submit an application.

Drilling indicator well - heat pump/ cooling system up to 50kW

Drilling for the construction of extraction and absorption wells for groundwater heat pumps or cooling systems must be notified in good time before drilling work begins.

Advice on the ecological criteria catalogue

If you want to build on a municipal property, you must comply with the ecological criteria catalogue of the City of Munich. We can advise you on this.

Water law permit - geothermal probe/ geothermal collector

A permit under water law is required for the construction of a geothermal system (probe, collector, baskets or similar) with groundwater contact.

Drilling and working in groundwater

Work that penetrates so deeply into the ground that groundwater could be encountered must be reported at least one month before the planned start of work.

Water law permit - construction projects in groundwater

In the course of a construction project, there may be interventions in the groundwater for which a permit under water law is required.

Completion of the replacement planting

If you have felled a tree, a replacement planting may be required as compensation. The completion of this replanting must be reported.

Water law permit - rainwater infiltration in water protection areas

A permit under water law is required for the extensive infiltration of rainwater into the subsoil in a water protection area.

Water licence - heat pump/ cooling system up to 50kW

Anyone who pumps or infiltrates groundwater via a well and uses it to operate a groundwater heat pump or cooling system requires a permit under water law.

Water permit - heat pump/ cooling system from 50kW

Anyone who extracts or infiltrates groundwater via a well and uses it to operate a groundwater heat pump or cooling system requires a water licence.